Japanese

Electricity Monitoring

Electricity Monitoring of Tsukuba Campus

TEMS

Ahead of expected power shortages in the coming months, the Japanese government has set its summer energy-saving target at 15 % for areas which are supplied by the Tokyo and Tohoku power companies. To achieve this target for sure, University of Tsukuba has set its target at 25 %. The power-saving target is set at 17,145kW(25 % YoY decrease)against the Standard Power Usage (the maximum power usage on Tsukuba Campus during the same period of last year) of 22,860kW.
The University of Tsukuba Electricity Monitoring System (TEMS) works to visualize the information of power usage, and enables us to share the information about it. The University of Tsukuba makes use of TEMS to improve one’s consciousness of power-saving.



Electricity Monitoring of Tsukuba Campus( Wed , Nov 06 , 2024 08:20 )
Power Usage Rate:
46 [%]
筑波キャンパスの電力使用状況

Power Usage: 9,720 (kW)

Standard Power Usage: 20,680 (kW)

Energy-Saving Target:
20,266 (kW)

TEMS-Data
(The data includes the Power Usage of University Hospital, excluding that of Residence Halls.)